Making World Beautiful

Bathroom renovation cost in London (2026)

By Kristian Toth, Co-owner, Making World Beautiful · Last updated: 16 October 2026

Short answer

Most MWB bathroom renovations in London cost £15,000–£40,000. A standard bathroom takes about 2–4 weeks on site.

Renovated marble bathroom in South Kensington
ScopeTypical costTime on site
Shower room or en-suite£15,000–£22,0002–3 weeks
Family bathroom, full refit£22,000–£30,0003–4 weeks
Premium: stone, wet room, bespoke vanity£30,000–£40,0004–5 weeks

Indicative MWB prices including labour and materials. Your fixed price follows a free site visit.

What drives the cost of a bathroom?

Tiling area, waterproofing and moving pipework drive most of the cost.

  • Tiles and natural stone
  • Wet room tanking and underfloor heating
  • Sanitaryware and brassware
  • Moving soil pipes or the toilet position

What hidden costs should I budget for?

Allow roughly 10–15% on top of the build price for fees and contingency. The most common extras in London are:

  • Party wall surveyor: typically £700–£1,500 per neighbour if works affect a shared wall
  • Structural engineer calculations: usually £500–£2,000
  • Building control fees: commonly £800–£2,000 depending on the council
  • Skip permits and parking suspensions: charged per week by the borough
  • Planning or lawful development certificate fees where needed

Frequently asked questions

How much does a bathroom renovation cost in London?

With MWB, between £15,000–£40,000.

How long does a bathroom renovation take?

Usually 2–4 weeks on site, up to 5 weeks for premium stone bathrooms.

Keep reading

Let's build something beautiful.

Free consultation. Fixed quote after a site visit.